Infrastructure Details

Existing Infrastructure

  • G+3 building completed
  • 12 Classrooms – 25’ x 20’ feet
  • 1 Computer Room – 25’ x 20” feet
  • 1 Library Room – – 51’4” x 25’ feet
  • Composite Science Laboratory – 25’ x 20’ feet
  • 1 Principal Room – 20” x 12’6” feet
  • 1 staff room – 20’ x 17’7” feet
  • 1 Maths Lab – 20” x 12’6” feet
  • 1 Music Room: 20’ x 12’1” feet
  • 1 Sports Room: 20’ x 11’7” feet
  • 1 Lobby(Multi Activity): 19’1” x 24”
  • Children’s play area with multiple swings, slide, multi-station and other play equipment
  • 4 girl’s toilet with two seats each, 1 toilet on each floor
  • 2 boy’s toilet with two toilet and 2 urinals, 2 boy’s toilet with two toilet and 3 urinals, 1 toilet on each floor
  • 2 staff toilet
  • 1 toilet with 2 seats for external visitors/vendors/parents
  • 2 Kho-Kho ground
  • 2 Volleyball Ground
  • High Jump/ Long Jump Area
  • Running Track – 250m
  • Football/Cricket Ground
  • Stage for prayer and other performance

Floor wise Infrastructure

Ground Floor:

  1. Computer Lab
  2. Principal Room
  3. Staff Room
  4. Math Lab
  5. Sports Room
  6. Lobby
  7. Music Room

First Floor and Second Floor:

5 classrooms on each floor

Third Floor

  1. 2 classrooms
  2. 1 composite science lab
  3. Library
Ed Sport news INFO
All the latest school sport and grass roots reports on ED Sport. News, reports, analysis and more.
SEE ALL
Categories
  • No categories
Latest Posts
Tweets
Please fill all required widget settings!
Contact Info
Praesent quis risus nec mi feugiat vehicula. Sed nec feugiat arcu.
  • Address Line 1
  • (123) 456 789
  • email@example.com