Infrastructure Details
Existing Infrastructure
- G+3 building completed
- 12 Classrooms – 25’ x 20’ feet
- 1 Computer Room – 25’ x 20” feet
- 1 Library Room – – 51’4” x 25’ feet
- Composite Science Laboratory – 25’ x 20’ feet
- 1 Principal Room – 20” x 12’6” feet
- 1 staff room – 20’ x 17’7” feet
- 1 Maths Lab – 20” x 12’6” feet
- 1 Music Room: 20’ x 12’1” feet
- 1 Sports Room: 20’ x 11’7” feet
- 1 Lobby(Multi Activity): 19’1” x 24”
- Children’s play area with multiple swings, slide, multi-station and other play equipment
- 4 girl’s toilet with two seats each, 1 toilet on each floor
- 2 boy’s toilet with two toilet and 2 urinals, 2 boy’s toilet with two toilet and 3 urinals, 1 toilet on each floor
- 2 staff toilet
- 1 toilet with 2 seats for external visitors/vendors/parents
- 2 Kho-Kho ground
- 2 Volleyball Ground
- High Jump/ Long Jump Area
- Running Track – 250m
- Football/Cricket Ground
- Stage for prayer and other performance
Floor wise Infrastructure
Ground Floor:
- Computer Lab
- Principal Room
- Staff Room
- Math Lab
- Sports Room
- Lobby
- Music Room
First Floor and Second Floor:
5 classrooms on each floor
Third Floor
- 2 classrooms
- 1 composite science lab
- Library